The pipe is the DN600 Canning Hwy distribution main, it was installed in 1986 under the bridge and is currently being replaced with two new DN630 PE (Polyethylene) mains that'll cross the river. It supplies water from Buckland Hill Reservoir. -- CalWood 00:55, 9 June 2025